News and Events
PREFERRED REALIGNMENT OF FM 973 SELECTED
06/21/2018

After proposing 4 alternative routes and hosting an open house in December, TxDOT has selected Alternative B as the preferred alignment for FM 973. Among the alternatives, Alternative B received the most positive feedback, is the shortest route with the most direct alignment, requires the lowest estimated construction costs, minimizes impacts within the floodplain, and requires minimal displacements of homes, businesses and property. The proposed project would consist of four travel lanes (two in each direction) and separated by a grassy median as well as including a shared-use path. Construction is proposed to begin in 2022 contingent on environmental clearance and construction funding.

 

TxDOT 973 Realignment Project Page

 

 

Preferred Alignment Graphic

 


The City of Manor Strives to promote Community spirit through the preservation of our unique character and heritage, while fostering a dynamic economic environment.

Copyright © Manor, Texas  2016

powered by ezTaskTitanium TM